Myth 3: CPEC is not equally catering to all provinces - CPEC Latest News

Myth 3: CPEC is not equally catering to all provinces


Category : CPEC Facts vs Fictions   Source : PCI   Date : 01-04-2018   

  • The deputy Chief of mission Chinese Embassy Zhao Lijian gave a break-up of CPEC projects in a series of tweets pasted at Wali Zahid’s blog that the number of projects included: Balochistan 16, KPK 8, Sindh 13 and Punjab 12.
  • Zhao said at least 16 projects under CPEC are related to Balochistan. These include: Khuzdar-Basima Highway (N-30), D.I.Khan-Quetta Highway (N-50), Hubco Coal Power Plant, Gwadar Power Plant, Gwadar-Nawabshah LNG Terminal and Pipeline, Gwadar Eastbay Expressway, Gwadar New International Airport, Gwadar Smart Port City Master Plan, Expansion of Multi-purpose Terminal including Breakwater & Dredging Wastewater, Treatment Plants for Gwadar City, Gwadar Primary School, Gwadar Hospital Upgradation, Gwadar Technical & Vocational College,Gwadar Eastbay Expressway II, Fresh Water Supply and Gwadar Free Zone.
  • About Khyber Pakhtunkwa, he said at least eight projects under CPEC relate to KPK: Joint Feasibility Study for Upgradation of ML1, Establishment of Havelian Dry Port, KKH II (Havelian-Thakot) Upgradation of ML-1, KKH III (Raikot-Thakot), D.I.Khan-Quetta Highway (N-50), Suki Kinari Hydropower Project and Optical Fiber Cable from Rawalpindi to Khunjrab.
  • He said that 13 CPEC projects relate to Sindh: Matiari- Lahore Transmission Line, Matiari-Faisalabad Transmission Line, Port Qasim Power Plant Engro Thar Power Plant & Surface Mine in Block II of Thar Coal Field Dawood Wind Farm, Jhimpir Wind Farm, Sachal Wind Farm,China-Sunec Wind Farm,Upgradation of ML-1, Thar Coal Block I & Mine Mouth Power Plant,Gwadar-Nawabshah LNG Terminal & Pipeline,Karachi-Lahore Motorway (Sukkur-Multan), Joint Feasibility Study for Upgradation of ML1.
  • He said only 12 projects under CPEC relate to Punjab and these are: Optical Fiber Cable from Rawalpindi to Khunjrab, Haier & Ruba Economic Zone II, Karachi-Lahore Motorway (Sukkur-Multan), Joint Feasibility Study for Upgradation of ML1, Upgradation of ML-1, Sahiwal Coal-Fired Power Plant, Rahimyar Khan Coal Power Plant, Karot Hydro-Power Plant, Lahore Orange Line Metro Train, Matiari-Lahore Transmission Line, Matiari-Faisalabad Transmission Line Quaid-e-Azam Solar Park in Bahawalpur.

(source https://www.samaa.tv/economy/2016/10/chinese-embassy-releases-province-wise-share-under-cpec-project/)